Cost of Equity Calculator

Cost of equity is the return shareholders expect for holding your stock instead of a safe Treasury bond. Using a 4.99% 10-year Treasury yield from October 27, 2026, a beta of 1.1, and the 3.70% equity risk premium Damodaran published for October 2026, CAPM gives 9.06%, and the dividend cross-check on a $46 stock says 7.12%.

1. Capital Asset Pricing Model (CAPM)
10-year Treasury yield: 4.99% on Oct 27, 2026
1.0 = moves with the market
Damodaran implied ERP: 3.70% (Oct 2026)
Add-on for small or micro caps
2. Dividend Growth Cross-Check (Optional)

All calculations run in your browser. Nothing you type is uploaded anywhere.

Cost of Equity (CAPM)
9.06%
4.99% risk-free base + 4.07% beta premium + 0.00% size premium
Beta Premium (Beta x ERP)
4.07%
Expected Market Return
8.69%
Dividend Growth Model
7.12%
Two-Model Average
8.09%
Model Comparison
Required Return at Different Betas (Same Risk-Free Rate and Premium)
Beta Beta Premium Size Premium Cost of Equity

Estimate the return your shareholders expect: risk-free rate, beta, equity risk premium, size premium, and a dividend model to cross-check the answer.

By the Lelifi editors ·

Key takeaways

Where the 9.06% required return comes from4.99%4.07%Risk-free base: 4.99%Beta premium: 1.1 x 3.70 = 4.07 points
Of the 9.06% required return, the 4.99% risk-free base contributes 55.1% and the 1.1 beta premium adds the other 4.07 points.
Cost of equity at each beta (4.99% risk-free, 3.70% premium)Beta 0.87.95%Beta 1.08.69%Beta 1.1 (Example A)9.06%Beta 1.510.54%Beta 2.012.39%
With a 4.99% risk-free rate and a 3.70% premium, the required return climbs from 7.95% at a beta of 0.8 to 12.39% at a beta of 2.
On this page
  1. What Cost of Equity Means
  2. The CAPM Formula, Piece by Piece
  3. Worked Example A: A Mid-Sized Stock at October 2026 Rates
  4. Worked Example B: A Small-Cap With a Size Premium
  5. Where Each Input Comes From
  6. How the Answer Moves With Beta
  7. A Dividend Cross-Check on the Same Stock
  8. How Cost of Equity Feeds WACC

What Cost of Equity Means

Cost of equity is the return the owners of a company expect for putting money at risk instead of buying a Treasury bond. A 10-year Treasury paid 4.99% on October 27, 2026 with essentially no default risk, so shareholders demand a premium on top for the chance of losses. The safe rate plus that premium is the cost of equity.

Two groups use the number. Business owners use it as the hurdle a project must clear before it deserves capital: a project returning 6% when equity costs 9% destroys value even if the accountants report a profit. Investors use it as a fair-return benchmark: buying a stock that can only compound at 5% when comparable risk pays 9% is a bad trade at the market price.

Cost of equity is not a bill anyone sends you. It is an opportunity cost that moves with Treasury yields, market prices, and the risk profile of the business, which is why every input below carries a date and a source.

The CAPM Formula, Piece by Piece

The standard model is the Capital Asset Pricing Model, CAPM for short:

Cost of equity = Risk-free rate + Beta x (Expected market return - Risk-free rate)

Three moving parts. The risk-free rate is the yield on long US government debt, normally the 10-year Treasury. The expected market return is what a broad equity index is priced to deliver. The gap between the two is the equity risk premium, the extra return the whole stock market must offer to pull money out of bonds.

Beta scales that premium to the specific stock. A beta of 1.1 means the share historically moved about 10% more than the index in the same direction, so it earns 10% more than the market premium. A sleepy utility at a beta of 0.6 earns 60% of it.

Practitioners often add a fourth term for small companies:

Cost of equity = Risk-free rate + Beta x ERP + Size premium

The size premium is a flat add-on that compensates for the higher failure rate of small firms. The calculator has a box for it; leave it at 0 for large caps.

Worked Example A: A Mid-Sized Stock at October 2026 Rates

Take a consumer brand with a beta of 1.1, measured the standard way: five years of monthly returns regressed against the S&P 500. The inputs are dated so the math can be reproduced later:

Risk-free rate: 4.99%. The 10-year constant maturity yield published by the US Treasury daily par yield curve for October 27, 2026.

Equity risk premium: 3.70%. NYU Stern professor Damodaran's implied equity risk premium (October 2026) for the S&P 500, which he publishes at the start of every month. His expected return on equities was 8.99% against a then 5.29% 10-year yield; pair his premium with whichever risk-free rate is current.

Now the arithmetic, one step at a time. First the premium the beta earns: 1.1 x 3.70 = 4.07. Then the base: 4.99 + 4.07 = 9.06. The cost of equity is 9.06%.

Read it as a sentence: the owners of this business expect to make 9.06% a year, before taxes and after nothing, for holding a share that moves slightly harder than the market. Any project, acquisition, or reinvestment inside the company should clear that bar. If management reinvests at 7%, the gap of 9.06 - 7 = 2.06 points is value destroyed every year, compounding.

Worked Example B: A Small-Cap With a Size Premium

Now a regional manufacturer worth $400 million. Its shares move with the market but a bit less, so five years of monthly returns give a beta of 0.9. Small firms fail more often than large ones across market history, so valuation practice adds a size premium. Published size-decile research is the source for the number; for this example assume 1.50 points, a level you would defend with the specific size-decile table you cite.

The beta term first: 0.9 x 3.70 = 3.33. Stack the three pieces: 4.99 + 3.33 + 1.50 = 9.82. The cost of equity is 9.82%.

Compare the two examples. The small company has the lower beta (0.9 against 1.1), yet a higher hurdle, because the size premium more than covers the difference. Without the premium its required return would be 4.99 + 3.33 = 8.32%, and the premium adds 1.50 points to reach 9.82%.

Two cautions. Betas on thinly traded small caps are noisy, so many analysts average the betas of a handful of public comparables instead of trusting one regression. And a size premium is an assumption, not a law: if you cannot point to the dataset behind your number, run the calculation both ways and see whether the investment decision changes.

Where Each Input Comes From

Every input in the calculator has a public source, which is what keeps the output defensible in a memo or a negotiation. The table lists where each number came from for the examples above.

InputWhere it comes fromValue used here
Risk-free rate10-year constant maturity yield from the US Treasury daily par yield curve (2026)4.99% on Oct 27, 2026
Equity risk premiumDamodaran implied ERP, NYU Stern (2026)3.70% at the start of Oct 2026
Expected market returnDamodaran's implied expected return on the S&P 500, same source8.99% at the start of Oct 2026
Beta5-year monthly regression vs the S&P 500, published by free stock screeners; company risk factors are discussed in filings on SEC EDGAR (2026)1.1 (Example A), 0.9 (Example B)
Size premiumPublished size-decile premium tables (Damodaran, NYU Stern)1.50 points assumed in Example B

Date-stamp everything. The 10-year yield fell from 5.31% on October 5, 2026 to 4.99% by October 27, a move of 0.32 points in three weeks, which alone shifts the Example A answer from 9.38% to 9.06%. An undated cost of equity is not reproducible, and a number nobody can reproduce is an opinion.

Beta deserves one more note. Screeners compute it differently (some use 2 years of weekly returns, some 5 years monthly), so the same stock can show 1.05 on one site and 1.18 on another. Pick one convention, write down which one you used, and stay with it across every company you compare.

How the Answer Moves With Beta

Beta is the input users argue about, so it helps to see the whole range at once. Holding the risk-free rate at 4.99% and the premium at 3.70%, each beta implies its own cost of equity. The beta term comes first in each row:

BetaBeta x premiumCost of equity
0.80.8 x 3.70 = 2.967.95%
1.01 x 3.70 = 3.708.69%
1.1 (Example A)1.1 x 3.70 = 4.079.06%
1.51.5 x 3.70 = 5.5510.54%
2.02 x 3.70 = 7.4012.39%

The spread is wide. Moving from a beta of 0.8 to 2.0 adds 12.39 - 7.95 = 4.44 points to the hurdle, which flips a lot of marginal projects from acceptable to rejected. That is the point: CAPM turns a fuzzy argument about risk into one number you can put next to a forecast.

A Dividend Cross-Check on the Same Stock

CAPM prices risk from the outside in. A second model, the dividend growth model, prices the same stock from its own cash payouts: the required return is next year's dividend divided by the price, plus the growth rate of the dividend.

Cost of equity = (Dividend per share x (1 + growth)) / Price + growth

Example A's company pays $1.84 per share annually, trades at $46.00, and has grown the dividend about 3% a year. Next year's payout: 1.84 x 1.03 = 1.8952, about $1.90, and you keep the unrounded figure in the math. The dividend yield on the current price: 1.8952 / 46 = 0.0412, or 4.12%. Add growth: 0.0412 + 0.03 = 0.0712, so the model says 7.12%.

The two models disagree: 9.06% against 7.12%, a gap of 9.06 - 7.12 = 1.94 points. That is normal and useful. The dividend model only sees payout and growth, so it misses risk the market is pricing; CAPM sees risk but not the company's specific cash flows. Many analysts split the difference and work from the average: (9.06 + 7.12) / 2 = 8.09, or 8.09%.

ModelInputs it usesAnswer for Example A
CAPMTreasury yield, beta, market premium9.06%
Dividend growth modelDividend $1.84, price $46.00, growth 3%7.12%
Average of bothEqual weight on each model8.09%

If the two models are more than a couple of points apart, one of your inputs is probably wrong: a stale beta, a growth rate copied from a boom year, or a price quote from a different week. Reconcile before you use either number.

How Cost of Equity Feeds WACC

Companies rarely run on equity alone, and the blended cost of all capital is the weighted average cost of capital, WACC. Cost of equity is its most expensive ingredient. Debt is cheaper for two reasons: lenders rank ahead of shareholders in a bankruptcy, and interest is deductible at the 21% federal corporate rate while dividends are not.

A quick illustration with Example A's company, financed 60% equity and 40% debt. The after-tax cost of the 4.99% loan: 4.99 x (1 - 0.21) = 3.94. Weight each cost and add: 9.06 x 0.60 = 5.44 and 3.94 x 0.40 = 1.58, so 5.44 + 1.58 = 7.02, a WACC of about 7.02%.

Capital pieceWeightCostWeighted contribution
Equity60%9.06%5.44
Debt, after tax40%3.94%1.58
WACC100%7.02

Notice the order of magnitude: equity is the expensive slice even at only 60% of the capital structure. That is why analysts who plug the cost of debt in where the cost of equity belongs understate hurdles by two or three points and approve projects they should reject.

This page stops at the relationship. WACC needs market-value weights, the company's actual rate on each debt issue, and a decision on how to treat leases and pensions, which is a calculator of its own. The number to carry from here is the equity cost: 9.06% for the mid-cap, 9.82% for the small-cap, both on October 2026 inputs.

Frequently asked questions

What does cost of equity mean in plain English?

It is the return the owners of a business expect for the risk they take. If a 10-year Treasury bond pays 4.99% with no default risk, shareholders want more than that, and CAPM puts a number on how much more.

How do I calculate cost of equity with CAPM?

Add the risk-free rate to beta times the equity risk premium. With a 4.99% rate, a beta of 1.1, and a 3.70% premium, the math is 1.1 x 3.70 = 4.07, then 4.99 + 4.07 = 9.06%.

What risk-free rate should I use right now?

The 10-year Treasury constant maturity yield was 4.99% on October 27, 2026, per the Treasury daily par yield curve. Pull the latest number from the same page when you run your own numbers; the 10-year term matches the long horizon of an equity claim.

What equity risk premium applies in 2026?

Damodaran implied equity risk premium for the S&P 500 stood at 3.70% at the start of October 2026, down from 4.37% in early March 2026 as Treasury yields climbed. It moves every month, so date-stamp whatever figure you use.

What is a normal beta for a stock?

Most large US stocks land somewhere between about 0.6 and 1.6. The market beta is 1 by construction. Utilities tend to sit near the low end and high-multiple growth names near the top; the 1.1 used in Example A is a mild-aggressive profile.

Why would I add a size premium on top of CAPM?

Small firms have failed more often across market history, so valuation practice adds extra return for size. Example B adds 1.50 points for a small-cap, lifting its required return from 8.32% to 9.82%.

My company pays no dividends. Can I still cross-check?

Yes. Substitute free cash flow to equity for the dividend, or lean on the CAPM result alone. The dividend model in this calculator is a second opinion, not a requirement.

Is cost of equity the same as the return I promised investors?

No. A promised return is a fixed term in a contract. Cost of equity is an opportunity cost that moves with Treasury yields and market prices every month, which is why it gets recomputed rather than agreed once.

Why is equity more expensive than debt?

Interest is deductible and lenders get paid first. A 4.99% loan costs about 3.94% after the 21% federal corporate tax shield, since 4.99 x (1 - 0.21) = 3.94, while equity carries its full 9.06% with no deduction.

How do I estimate beta for a private company?

Find 3 to 6 public comparables, average their betas, then unlever and relever for your capital structure. Type the relevered number into the beta box; the calculator treats it like any other beta.

How often should I refresh these inputs?

At minimum whenever rates move. The 10-year yield fell from 5.31% on October 5, 2026 to 4.99% on October 27, a drop of 0.32 points in three weeks, worth 0.35 points of required return at a beta of 1.1.

Does the calculator handle country risk or currency?

No. It prices a US-dollar equity claim. For emerging markets, practitioners add a country risk premium on top, which Damodaran publishes by country each year on the same NYU Stern data library.

Is the output a guarantee of returns?

No. Cost of equity is an expectation built on estimates, and actual returns can be negative. Treat it as a hurdle rate for comparing projects and stocks, not as a promise.