A 40 foot trench, 1 foot wide and 12 inches deep, removes 40 cubic feet of soil and takes 1.48 cubic yards of gravel. That is 80 half-cubic-foot bags. Give the pipe 1/8 inch of fall per foot, so a 50 foot run drops 6.25 inches, and point the pipe holes down.

Enter your trench length, width and depth to see how much soil comes out, how much gravel goes back in, and how far the pipe should drop over its run.

By the Lelifi editors ·

Key takeaways

40 ft trench, 1 ft wide, 12 in deep40 x 1 x 12 / 12 = 40 cu ft40 / 27 = 1.48 cu yd40 / 0.5 = 80 half-ft3 bags= 80 bags of gravel
Material count for a 40 foot trench, 1 foot wide and 12 inches deep.
Trench volume in cu ft (1 ft wide, 12 in deep)20406020 ft trench (20)40 ft trench (40)60 ft trench (60)
Trench volume in cubic feet for three common drain lengths at 1 foot wide and 12 inches deep.
On this page
  1. What a French drain does
  2. Sizing the trench: length times width times depth
  3. The slope: about 1/8 inch of fall per foot
  4. Pipe size and which way the holes face
  5. Trench sizes and materials at a glance
  6. What the materials cost
  7. Common mistakes, and how to avoid them

What a French drain does

A French drain is a gravel-filled trench with a perforated pipe at the bottom. Water soaks into the gravel, enters the pipe through its holes, and runs downhill to an outlet such as a ditch, a dry well or the street. It is the standard fix for a soggy lawn, water pooled along a foundation, or a slope that dumps runoff into your yard.

Three things decide whether the drain works: the trench size, the slope, and the pipe. Get the trench size right and you buy the correct amount of gravel in one trip. Get the slope right and water moves instead of pooling. Get the pipe orientation right and water enters instead of sitting in the gravel. This page handles the measuring and the material counts, and it follows the same build the City of Norfolk describes in its drainage guidance: a trench at least 12 inches wide, 18 to 24 inches deep, with the pipe sloped 1 inch for every 8 feet of run.

One warning before you dig: call 811 first. Utility lines are buried shallowly, and a 2 foot trench can reach them. The call is free and the mark-out usually takes a few days.

Sizing the trench: length times width times depth

The trench is a simple box, so the digging math is length times width times depth. Keep the units straight: measure length and width in feet, depth in inches, and divide the depth by 12 to convert it to feet.

Worked example, a 40 foot drain with a 1 foot wide, 12 inch deep trench:

A longer example shows why the volume grows fast. A 60 foot trench at 1.5 feet wide and 18 inches deep holds 60 x 1.5 x 18 / 12 = 135 cubic feet, and 135 / 27 = 5 cubic yards. Bagged, that is 135 / 0.5 = 270 bags. The pipe itself displaces some gravel, roughly a fifth of a cubic foot per 10 foot stick of 4 inch pipe, so contractors order about 5 percent less gravel than the raw box volume and the bed still comes out right.

Depth matters more than width for capacity. Doubling depth doubles the volume, and a deeper drain also reaches the wet soil layer, which is the one you want to intercept.

The slope: about 1/8 inch of fall per foot

Slope is the most common failure point. Water in a flat pipe does not move, sediment settles, and the drain silts up from the flat end first. The working minimum is about 1 percent, which is 1/8 inch of drop for every foot of run. Washington State University Extension's drainage guide for Clark County puts the target between 0.5 and 1 percent, and more is fine if you have the elevation to spare.

To get total fall, multiply run by 0.125:

Check the fall with a string line and a line level, or a laser level if you have one, rather than by eye. Tie the string at the high end, pull it to the outlet, level it, then measure down every few feet as you dig. Digging slightly deeper at the outlet end and back-checking with the level beats trying to fix a flat spot after the gravel is in.

Pipe size and which way the holes face

Two pipe choices matter: diameter and hole direction.

For diameter, 4 inches is the residential standard and handles yard drainage, foundation perimeter lines and downspout ties. Go to 6 inches only for long runs from large areas or where the water table is high. A bigger pipe does not collect more water through the gravel; capacity in the ground comes from the gravel and the slope.

For hole direction, the usual advice for a yard drain is holes down. Set the pipe so perforations sit near the 4 and 8 o'clock positions. Groundwater rises from underneath, enters through the bottom holes, and leaves immediately, so the pipe carries water while mostly empty. If the holes face up, the whole trench has to fill before water finds the pipe, and the yard stays soggy longer. The Department of Energy's building science resource at PNNL shows the standard assembly, 4 inch perforated PVC laid perforations down in a fabric-lined trench. Note that some septic-system rules require holes up to collect rising groundwater, so follow your local health department where it applies.

Choose rigid PVC for long straight runs and anywhere vehicles may cross. Sock-wrapped corrugated pipe is easier to lay around curves and fine for most yards, but it catches more sediment over the years.<

The two diameters compared:

PipeBest forNote
4 inch perforatedYard drains, foundation perimeter, downspout tiesThe residential standard; stock everywhere
6 inch perforatedLong runs from large areas, high water tablesNeeds a wider trench and more gravel

On slope and flow, a 4 inch pipe on a 1 percent grade carries more storm water than most yards ever deliver, which is why upsizing rarely pays. The money usually does more good in extra depth or a steeper grade than in a wider pipe.

Trench sizes and materials at a glance

This table converts the common trench sizes into what you have to haul. All rows assume a 4 inch pipe and a fabric liner.

Trench (L x W x D)Soil outGravelHalf-ft³ bags
20 ft x 1 ft x 12 in20 ft³0.74 yd³40
40 ft x 1 ft x 12 in40 ft³1.48 yd³80
60 ft x 1 ft x 18 in90 ft³3.33 yd³180
60 ft x 1.5 ft x 18 in135 ft³5.00 yd³270
100 ft x 1 ft x 24 in200 ft³7.41 yd³400

Reading the table, the jump from a 40 foot single-foot trench to the 60 foot wide-and-deep version is more than triple the gravel. Past about 2 cubic yards, ordering loose gravel by the yard from a landscape supplier beats bags on price and on the waste you carry to the curb.

Slope needs scale with run, so plan the outlet elevation before you commit to a length:

RunFall at 1/8 in per ftFall at 1/4 in per ft
25 ft3.13 in6.25 in
50 ft6.25 in12.5 in
75 ft9.38 in18.75 in
100 ft12.5 in25 in

If your yard cannot give the full fall, shorten the run or let the outlet daylights into a dry well with gravel around it, and steepen what run you do have.

What the materials cost

Gravel for a drain is clean, washed stone, usually 3/4 inch to 2 inch. Bagged decorative gravel at a home center runs about 5 to 7 dollars per half-cubic-foot bag, so the 80 bag example costs 80 x 6 = 480 dollars at the midpoint. Loose washed stone from a landscape yard commonly prices around 40 dollars per cubic yard, so the same 1.48 cubic yards runs near 60 dollars plus a delivery fee, which is most of the difference on any job over 2 yards.

The rest of the shopping list is short: a roll of nonwoven landscape fabric wide enough to line the trench and lap over the top, a 100 foot stick or coil of 4 inch perforated pipe, a bag of gravel for the pipe bed, and a cap fitting for the uphill end. Fabric and pipe for the 40 foot example together usually land in the 80 to 120 dollar range.

Labor is the real cost driver. Digging 40 cubic feet of soil by hand is a solid weekend for one person in average soil, and a trencher rental runs a few hours for the same cut. Hiring the dig out is usually the only part worth pricing against your own time.

Common mistakes, and how to avoid them

Most failed French drains fail for one of four reasons.

Two smaller ones are worth naming. Do not route roof downspouts into a yard drain meant for groundwater unless the pipe is sized for storm bursts, and do not plant trees over the line, because roots find the gravel voids and clog them within a few years.

This page is a planning estimate for a straightforward yard drain. Sites with structural water problems, steep slopes or permitting questions need a drainage contractor or your local building department before you dig.

Frequently asked questions

How much gravel do I need for a 40 foot French drain?

For a trench 40 feet long, 1 foot wide and 12 inches deep, the hole holds 40 cubic feet, so figure on 1.48 cubic yards of gravel, or 80 of the half-cubic-foot bags. The pipe takes up a little room, so 75 bags usually covers it with a small margin.

What slope should a French drain have?

Aim for about 1/8 inch of drop per foot of run, which is a 1 percent grade. Over 50 feet that is 6.25 inches of total fall. The City of Norfolk's drainage guide sets a minimum of 1 inch of fall for every 8 feet, which is slightly steeper than 1/8 inch per foot and works well.

How deep should a French drain be?

Most yard drains run 18 to 24 inches deep. Along a foundation, dig to the bottom of the footing or at least below the floor level, and keep the top of the pipe low enough that water can reach it. Norfolk's guidance calls for a trench at least 12 inches wide and 18 to 24 inches deep.

Should perforated pipe holes face up or down?

For a drain that lowers a soggy yard, point the holes down, toward the 4 and 8 o'clock positions. Water rises into the pipe from below and flows away without filling the whole trench first. Some septic and groundwater setups call for holes up, so follow your local rules where they differ.

How many bags of gravel for a 60 foot drain?

A 60 foot trench, 1.5 feet wide and 18 inches deep, holds 135 cubic feet, which is 5 cubic yards or 270 half-cubic-foot bags. Buying by the cubic yard at a landscape yard costs far less than 270 bagged loads.

What size pipe for a French drain?

4 inches is the standard residential choice, in rigid PVC or sock-wrapped corrugated pipe. Use 6 inch pipe only where you move water from a big area or a high water table. Wider pipe does not drain a yard better if the slope is wrong.

How much fall for a 100 foot French drain?

At 1/8 inch per foot, a 100 foot run needs 12.5 inches of total drop. If your yard cannot spare that much elevation, split the difference and steepen the first half, since any flat section is where sediment settles and clogs.

Can a French drain be too deep?

Yes. Below the water problem it does nothing, and every extra foot adds excavation and gravel cost. Dig just deep enough to reach the layer that holds water, and keep the outlet higher than the trench bottom so gravity can do the work.

Do I need landscape fabric around the gravel?

In anything but pure sand, yes. Fabric keeps soil out of the gravel voids, which is what keeps the drain working for years. Washington State University Extension's drainage guide describes the standard build: fabric-lined trench, perforated pipe, gravel, then fold the fabric over the top.

How much does a French drain cost in gravel?

At roughly 6 dollars per half-cubic-foot bag, the 80 bag example runs 480 dollars. The same gravel loose from a landscape yard often prices near 40 dollars a cubic yard, so 1.48 yards lands near 60 dollars plus delivery. Buying loose is almost always cheaper on jobs over 2 cubic yards.

Where should a French drain outlet be?

It must daylight somewhere lower than the trench, such as a ditch, a slope, a dry well or a storm drain you are allowed to use. A drain with no downhill outlet is just a buried gutter that backs up.

How wide should a French drain trench be?

12 inches is a good default for a 4 inch pipe. Narrow trenches are hard to fill evenly around the pipe, and wider ones cost gravel without draining more. If you use a trencher, widen the cut with a shovel so the pipe sits with gravel on all sides.

Does a French drain need maintenance?

It needs little upkeep, if it was built with fabric and correct slope. Check the outlet once or twice a year for leaves and sediment, and keep trees with aggressive roots away from the line. A drain that slows down after years usually has silt at the flat spot.

Can I run a French drain under a driveway?

Only with a rated pipe and proper cover, usually rigid PVC encased in gravel and concrete where vehicles cross. Flexible corrugated pipe crushes under car traffic, so plan a route around the paving if you can.

Spotted a wrong number or a broken result?

More Home Improvement tools

See all Home Improvement tools

Fee schedules, rates and rules change without notice. Always confirm important figures with the official source before you rely on them.